Amazon announced on November 23, 2026, that it had signed an agreement to buy the proprietary technology behind the Decart Optimization Stack, or DOS. Decart’s co-founders Dean Leitersdorf, Moshe Shalev and Orian Leitersdorf, together with its AI research and engineering team, are to join Amazon. The agreement targets software that improves how AI workloads use computing hardware. Amazon’s announcement
The deal has a direct connection to TLVNY’s two cities. Decart’s company profile describes a team of a little over 100 people across Tel Aviv, New York and San Francisco. The Israeli-founded lab has built both real-time AI models and the infrastructure supporting them. Amazon’s announcement focuses on that infrastructure technology and the people behind it.
What the agreement establishes
The roughly $7.5 billion figure circulating in coverage remains a reported price. Reuters reported on November 23 that Amazon declined to disclose financial terms or comment on the value; it attributed the figure to Bloomberg’s reporting, citing a person familiar with the matter. That distinction matters when assessing a transaction whose public announcement does not set out its financial structure.
CTech’s November 23 report says the agreement was signed the previous night, November 22, and describes cash and stock paid in installments. Those terms come from the publication’s reporting. Amazon confirms a signed agreement, with completion still dependent on customary conditions, including regulatory clearance. Signing therefore establishes an intended transaction; it does not mean the technology transfer and hiring have already been completed.
The software between the model and the chip
Decart’s DOS product description places the stack between AI workloads and their hardware. The company says it tunes kernels, compilers and runtime software to improve utilization across Nvidia GPUs, Google TPUs and Amazon Trainium. It supports training and inference workloads, including language models, agents, video and world models. These are descriptions of the company’s platform, rather than independent measurements of the proposed Amazon integration.
Two useful measures are how quickly an individual request receives a response and how much work a chip can handle overall. Decart describes improving both latency and throughput. For an application developer, those measures answer different questions. A live interaction needs a prompt response, while a service handling many simultaneous requests also needs enough capacity to keep doing that as demand rises.
A hypothetical video service makes the distinction concrete. A demonstration serving one viewer may respond quickly, yet become expensive or slow when many viewers arrive together. Evaluating an optimization system would require checking the same model, hardware, output quality and request load. A headline speed claim alone cannot establish what a customer will save on a different workload.
Amazon says it has worked with Decart on Trainium since 2025 and expects the technology to improve inference and custom-chip performance. Its announcement offers no new transaction-specific benchmark or customer rollout date. Those remain important milestones for assessing the integration.
A lab with models as well as infrastructure
The optimization business was already central to Decart before this agreement. In its May 18, 2026 funding announcement, the company disclosed a $300 million round led by Radical Ventures and introduced DOS 2.0. Nvidia was among the new investors. Decart presented three product lines: the optimization stack, Lucy for immersive experiences, and Oasis for physical-AI world simulation.
That earlier announcement is background, rather than new financing attached to the Amazon deal. It helps explain why a company known for video generation could attract interest for infrastructure. The same company developed user-facing models and the software intended to make their operation practical.
For customers of Lucy and Oasis, the useful follow-up questions concern contracts, support and future availability. An infrastructure transaction can create uncertainty for users of products built on that infrastructure, even when the headline focuses on chip performance. Clear product-specific guidance would help those users plan.
What the local teams and customers will watch
For Tel Aviv and New York, the relevant connection is an existing research company with people in both cities. The announcement does not allocate new jobs or investment to either location. It would be premature to turn the hiring agreement into a claim about a new local campus or a quantified expansion.
The next milestones are clearance and closing, followed by evidence of how the acquired technology reaches customers. Useful evidence would pair performance results with clear test conditions and explain which workloads receive the improvements. For developers choosing infrastructure, the practical outcome will be measured in reliable capacity, response times and cost for their own applications.




